The Details
Project Description
Customer in Dartmouth Massachusetts needed their existing heating and hot water equipment replaced, as well as an upgrade of their heating zone configuration.
Removed and replaced original oil boiler conversion and conventional, gas fired hot water heater with a cast iron, gas fired boiler and stainless steel, lifetime warranty, indirect hot water storage tank. Redesigned and re-controlled zone system to eliminate zone valves that were located throughout the home and upgraded each zone to an independent circulator, with a home run back to the boiler.







